Well I got the floor sort of in. Drilled a a couple holes and bolted the floor to the sub frames. The floor looks like it needs to come down about an 1" because the top of the dash is sitting too high and won't come close to the mounting brackets on the trans tunnel. Going to have to cut the sub frames out and trim them down and reweld them back in once floor position is finalized. Here's what it looks like.
Last edited: