As far as I can tell all the deceisions are done. Unless *knocks on wood* something crazy happens. We’ve already picked out all the paint, flooring, cabinets, etc.Don't know how I missed this thread. Congrats, Kendall!
Don't let the process stress you out. There are roughly 8 bajillion decisions to be made, each of which can be stressful if you allow it. Try to have fun with it, instead.
So the second floor has all the spare bedrooms and a bathroom. All of that will be the carpet, the bathroom will be the 12x12 tile and dark cabinets above the the tile. Everything else is located on the first floor. The only carpeted areas there are the master (and WIC) and study. Other than that it is all the wood looking tile located on the left of the pic. In the kitchen will be the white cabinets with the backsplash being tile with the hard to see rectangular dark tile except for the area above the cooktop which will be the tile with the designs. The island will be the gray cabinet and the granite sample is sitting on it. Laundry room gets the dark cabinets while the powder room gets the gray. The master bath has the wood looking tile flooring, gray cabinets, granite counter, and the shower will be tiled in the large tile (center of pic) with the accent glass at approx 5 ft above the floor.Bathroom, kitchen and laundry room?
I have the same 12" tile in the bathrooms and laundry rooms in my place that was just built.
Sent from my iPhone using Tapatalk
Don't know how I missed this thread. Congrats, Kendall!
Don't let the process stress you out. There are roughly 8 bajillion decisions to be made, each of which can be stressful if you allow it. Try to have fun with it, instead.
The foundation was poured a couple days ago. Wish I had gotten pics of all the tendons laid in place. Oh wellView attachment 1455924View attachment 1455925View attachment 1455926View attachment 1455927View attachment 1455928View attachment 1455929
And lolwtfbbqView attachment 1455930
Nice update man.
LOL @ the boot. Must have been a spare.
I wonder how much dirt they are going to place in the backyard as there will be a 3’x4’ pad poured for a door coming out of the 3rd bay. If you look at the back side where the third bay, it’s about 5’ vertical from ground to the top of the slab.
Dig 6 inches and you'll find water lol.
The foundation was poured a couple days ago. Wish I had gotten pics of all the tendons laid in place. Oh wellView attachment 1455924View attachment 1455925View attachment 1455926View attachment 1455927View attachment 1455928View attachment 1455929
And lolwtfbbqView attachment 1455930