Working on the IAT harness and connections for #36 and #56.
I located #36 and #56 pretty easy. I pushed in the piece of plastic blocking the unused #36 spot with no problem.
I placed the pinned wired into the #36 slot but it did not "lock" in place.
I can't "unlock" the #56 pin to remove for splicing the other wire of the IAT sensor.
I can't figure exactly where the "locking tab" is on the pin(s) to know which way to push.
Is the lock at the end or top of the pin side , or down at the base of the 70 pin plastic connector?
Is there a close up pic or video somewhere that I haven't found?
I located #36 and #56 pretty easy. I pushed in the piece of plastic blocking the unused #36 spot with no problem.
I placed the pinned wired into the #36 slot but it did not "lock" in place.
I can't "unlock" the #56 pin to remove for splicing the other wire of the IAT sensor.
I can't figure exactly where the "locking tab" is on the pin(s) to know which way to push.
Is the lock at the end or top of the pin side , or down at the base of the 70 pin plastic connector?
Is there a close up pic or video somewhere that I haven't found?