Finally :banana:
Haven't been on for a while with any updates, so figured i would share a little of what i have done. I also installed a ton of other parts including Boss mani, JLT CAI, Boss strut bar, HID's, fog deletes, Dynotech DS, GT500 axle pipes, Barton shifter, bracket, shift knob, and carbon boot at the same time. Total time i have into the rewire and relocate is about 25-30 hours.
Now for finished pics :beer:
Here's from the beginning and throughout the project
Haven't been on for a while with any updates, so figured i would share a little of what i have done. I also installed a ton of other parts including Boss mani, JLT CAI, Boss strut bar, HID's, fog deletes, Dynotech DS, GT500 axle pipes, Barton shifter, bracket, shift knob, and carbon boot at the same time. Total time i have into the rewire and relocate is about 25-30 hours.
Now for finished pics :beer:
Here's from the beginning and throughout the project
Last edited: