On the slate for this winter:
I still have the fuel system to do, but I don't know if I'll have enough dough to get that stuff done. If so, I'll also be plumbing in new fuel lines, rails, pump, regulator, filters and cell.
What's everyone else's plans?
- Dropping the entire IRS, welding and boxing it up.
- Upgrade halfshafts
- Upgrade driveshaft
- Finish my hammer shifter install (replace the trans linkage and gear indicator light)
- Rebuild the 8.8 on the Bird with 3.73's and aftermarket trac-loc
- Rebuild the 8.8 on the Mark with 4.10's
- Remove the already disconnected smog pump and cut off the bracket
- Remove the disconnected air conditioner stuff and cut off the bracket
- Install aluminum radiator and electric fan(s)
- Investigate aftermarket bracket for the alternator
- Investigate converting to manual steering
- Redo belt routing (again)
- Finish building the air box
- Finish WBo2, mount bung and install
- Remove NOS kit (to install in the Mark in the spring)
I still have the fuel system to do, but I don't know if I'll have enough dough to get that stuff done. If so, I'll also be plumbing in new fuel lines, rails, pump, regulator, filters and cell.
What's everyone else's plans?