Over the next month or so my car will be getting some work done to it.
Here is the laundry list:
rear disc conversion, sub frame connectors, new torq boxes, 347 shortblock, spec 2 clutch, and some other little thing. A good friend of mine has a 3000 sqft garage, so over the next several Saturdays we should be able to knock it out.
Here is the laundry list:
rear disc conversion, sub frame connectors, new torq boxes, 347 shortblock, spec 2 clutch, and some other little thing. A good friend of mine has a 3000 sqft garage, so over the next several Saturdays we should be able to knock it out.