I've been busy

Schmuckingham

New Member
Established Member
Joined
Apr 28, 2007
Messages
533
Location
Ohio
Coolant X over mod, cleaning IC, Reichard blower spacer, Dynatech LTs, complete fuel system are all getting installed this month. Havent started the LTs yet but i already ran into a problem with the spacer. The guide pins are too big for the lower intake and IC assembly so the guides need machined down on each end.

DSC02096.gif

DSC02089.gif

DSC02090.gif

DSC02097.gif

DSC02095.gif
 

Schmuckingham

New Member
Established Member
Joined
Apr 28, 2007
Messages
533
Location
Ohio
Turn the chair so you can stare at the Lightning instead of the Vette. :thumbsup:



AHAHA its turned that way so i make sure it doesnt break just sitting there.


I wasnt heating the tires in the Vette but i was plugging in the batt charger, id like to catch that POS on fire.

I took the front end off so i would scratch it and swap out to stock grilles
 

Schmuckingham

New Member
Established Member
Joined
Apr 28, 2007
Messages
533
Location
Ohio
The two guide pins that replace the stockers. I called Reichard and they said they machine them big because they have seen varying sizes of guide holes.
 

Users who are viewing this thread



Top