The floor received an Epoxy Shield coating, the Bend Pak MX-10ACX automotive lift has been installed, the compressor is in, storage racks are installed, got tunes, got 2.5 tons of A/C, and the security cameras are functioning. I just have a little bit of touch-up left on my garage and it will be to my liking. I didn't show the 2-car garage with dog kennels because it's nothing special.
My digital camera doesn't take the best pictures, but you'll get a general idea:
http://www.henry-bell.com/images/Garage
Can anybody give me pointers to complete the garage? I need a bench to attach a vise to, and I need to mount the air line hosereel on the left side Bend Pak tower. I know I'm missing something.
My digital camera doesn't take the best pictures, but you'll get a general idea:
http://www.henry-bell.com/images/Garage
Can anybody give me pointers to complete the garage? I need a bench to attach a vise to, and I need to mount the air line hosereel on the left side Bend Pak tower. I know I'm missing something.