My winter projects included installing new SOS pillar gauge pods, with Speedhut Fuel pressure gauge and Innovate motorsports LC-1 & XD-16. While I was adding the bung for the AFR, I modified the stock H and tails. Long winter. On the tailpipes, I removed all the SS clamps (Bassani system has six), seal welded all the joints, wirewheeled the stainlaess to a shine, then wet sanded with 600, finishing up with Eastwood's stainless steel polishing compound that I had left over form another project. Enjoy the pics: