JLT CAI pics and info

Tucker

Active Member
Joined
Sep 7, 2003
Messages
4,727
Location
Chesapeake VA
We are getting closer to production on our 2011 GT CAI and wanted to give you some highlights of what we have been working on.
First off this will be our first kit with the MAF housing incorporated into the tube in both Carbon Fiber and Plastic versions. This makes for a smooth interior and a smooth look to the tube itself.
MAF size is still undetermined, but will be in the area of 110-112mm. We have been putting miles on our proto type 110mm kit for a few weeks now and drivability is great and power is awesome. Early testing showed gains of 20-26 RWHP with our CAI and tune, but we have more testing to come. If you see more “claimed” by others, ask them how. Also look over the dyno sheets real good for low number baseline runs or no dyno sheets at all.

Shown is a color matched version that is made from Rotational molded cross link plastic. Color matched versions will be 6-8 weeks away, but Carbon Fiber will be first.

We also have a huge ABC plastic airbox that uses the factory intake air duct from the grille. We also took it a step further and added a weather strip that seals it to the hood.

We totally reformed the intake for a smooth air path and overall look. We even took the interior sound tube into consideration. Some want it and some don’t, so we moved it to the inside and center of the tube. Caps will be provided so you can remove the tube and cap the fitting in the JLT tube. Because we lowered the fitting, when it’s capped it’s less noticeable at most angles looking into the engine compartment.

All JLT CAI kits will have all parts for manual and automatic, same part #. Automatic tubes need an additional fitting, which we provide. The fittings are Milled from solid billet aluminum and all you need to do is drill a ½” hole (we show you where) in the tube, install the supplied grommet, fitting and you’re done.

Final pricing has not been set, but our Carbon Fiber version will be cheaper then most on the market now and painted plastic will be even cheaper!

I know we are behind, but we are coming up fast and will be worth the wait!

Thank you for your patients. Carbon Fiber pictures coming in 2 weeks.
Jay
38960_417021087154_52080517154_5309047_7984406_n.jpg

39851_417021117154_52080517154_5309049_220018_n.jpg

39851_417021122154_52080517154_5309050_1522999_n.jpg

39851_417021127154_52080517154_5309051_1967645_n.jpg
 

Users who are viewing this thread



Top