I haven't seen too many (if any) threads on the parts/components/buildup of a HPP twin kit, so I thought I would share.
For those that don't know, the Eaton/Spray will be replaced with a twin 61mm turbo setup from HPP. Received most of the kit today. Turbos, other wastegate, and intercooler will arrive next week, as will the motor...
Never been so excited to see FedEx!!!
So here it is, part of it anyway.
Intake side... Got aluminum to save weight and it will get polished.
Hot side:
Mafia to extend GT500 Maf:
TIAL 50mm BOV:
TurboSmart 38mm UltraGate Wastegate:
Sullivan Rails with 75# RC Injectors:
Sullivan lower with custom sheet metal upper:
Tuff Stuff 200 Amp Alternator (not part of the kit, but alternator probs will be no more!) :
Various Fittings:
Clamps
Turbo Blankies:
New Vac/Boost gauge with barely enough of a reading!!! :
And instrument bezel that will hold the wideband gauge and Eboost2 EBC:
Needless to say, I'm pumped. Gonna go fishing tomorrow morning with a buddy and get a good day of relaxation in. Then it's on to wrenching and getting this thing going. Motor should be here next week as well.
For those that don't know, the Eaton/Spray will be replaced with a twin 61mm turbo setup from HPP. Received most of the kit today. Turbos, other wastegate, and intercooler will arrive next week, as will the motor...
Never been so excited to see FedEx!!!
So here it is, part of it anyway.
Intake side... Got aluminum to save weight and it will get polished.
Hot side:
Mafia to extend GT500 Maf:
TIAL 50mm BOV:
TurboSmart 38mm UltraGate Wastegate:
Sullivan Rails with 75# RC Injectors:
Sullivan lower with custom sheet metal upper:
Tuff Stuff 200 Amp Alternator (not part of the kit, but alternator probs will be no more!) :
Various Fittings:
Clamps
Turbo Blankies:
New Vac/Boost gauge with barely enough of a reading!!! :
And instrument bezel that will hold the wideband gauge and Eboost2 EBC:
Needless to say, I'm pumped. Gonna go fishing tomorrow morning with a buddy and get a good day of relaxation in. Then it's on to wrenching and getting this thing going. Motor should be here next week as well.