I have to admit that if I absolutely wanted a CFTP optioned GT-500, I would probably bite the bullet and suffer with the ADM additional cost.
I have to admit that if I absolutely wanted a CFTP optioned GT-500, I would probably bite the bullet and suffer with the ADM additional cost.